CIP84 - Hopkinton and Sawmill Road Water Main Cleaning and Lining Project
October 10, 2014
On Wednesday, October 15th, the contractor is scheduled to test the hydrant on Hopkinton Road in the vicinity of Currier Road. The work will take about half the day and traffic will be reduced to one lane in each direction. This completes the project.

September 19, 2014
Paving the water trenches on Hopkinton Road, and work area cleanup, will continue into next week. Traffic will be reduced to one lane on Hopkinton Road, between Currier and Loop Road, during the paving operation.

September 12, 2014
The areas of Hopkinton Road that were disturbed for the water main cleaning & lining will be paved next week. One-way traffic will be maintained in the vicinity of the paving. Traffic delays are anticipated.

August 15, 2014
Water on Currier Road, Hopkinton Road (west of Currier Road) and Deer Track Lane will be shut down on Monday, August 18th, from 7:00 AM to 7:00 PM, in order to connect the newly lined pipe to the exiting water main. Traffic delays are anticipated. At the end of next week, the contractor will focus on cleaning the cross country main between Hopkinton Road and Sawmill Road.

August 1, 2014
The contractor will continue to clean up Hopkinton Road. If completed by week's end they will begin to line the cross country main. Traffic will be reduced to one lane in the vicinity of the work crew.

July 18, 2014
Next week, the contractor will be lining the water main on Hopkinton Road. Minor traffic delays are expected.

July 11, 2014
Next week, the contractor will complete tying residents to the temporary water main on Hopkinton Road. Mid-week, there will be a scheduled water main shut down on Currier Road and Hopkinton Road, west of Currier Road. Affective residents will be notified. The contractor will begin to line the 8-inch water main on Hopkinton Road, from the cemetery westerly toward Currier Road.

July 3, 2014
Next week, the contractor will continue to clear trees on the Sawmill Road cross country water main and connecting residents to temporary water on Hopkinton Road. Traffic delays on Hopkinton Road are expected.

June 27, 2014
Next week on Hopkinton Road, the contractor will be excavating the access pits to the water main and will begin to connect the residents to the temporary water main. Traffic delays are expected. Tree and brush clearing will occur to access the cross country water main between Hopkinton and Sawmill Road.

June 20, 2014
Next week, the Contractor will be mobilizing on Hopkinton Road in the vicinity of Loop Road. There will be minimal traffic impacts.

June 13, 2014
A neighborhood meeting is scheduled for Tuesday June 17, 2017 at 6:00 PM in the City Council Chambers located at 37 Green Street. The meeting will discuss the 2,500 feet of lining the 8-inch water main on Hopkinton Road, between Loop and Currier Roads; traffic impacts; and the cross country lining of Sawmill Road. Construction is scheduled to begin on June 23, 2014 and will continue into September.